Virtual reality paint training keeps aging warbirds flight ready
When an aircraft sits grounded on a flight line or depot floor, every passing hour is counted against mission capability. In depot maintenance, these delays are measured in “flow days” – the critical downtime required to strip, inspect, repair and paint vital components. One of the most critical front lines of aircraft survivability and operational readiness is only fractions of a millimeter thick: the paint.
Plan Gratis · Plus 29 CA$ o Pro 99 CA$/mes


